Request for Proposal (RFP)

Black & Veatch Construction, Inc. (Bvci)   Santa Cruz, CA   Full-time
This job is no longer available.
Job Posting Shared.
Job Posting Reminder Sent.

Black & Veatch Construction, Inc. (BVCI) will be issuing Request for Proposal (RFP) packages in support of the construction of a new tertiary treatment facility at the existing Santa Cruz Wastewater Treatment Facility located at 110 California St, Santa Cruz, CA and an advanced water purification facility at the Chanticleer Site located on the SW corner of Soquel Avenue and Chanticleer Avenue, collectively forming the Pure Water Soquel Treatment Facility, a design-build project for the Soquel Creek Water District. The furnish and install RFP packages available to bid include: site demo, earthwork, concrete/rebar, mechanical, equipment install, electrical/I&C, auger piling, yard pipe, dewatering, structural steel, bolted tank, pre-engineered building, building finishes, plumbing, fire protection, HVAC, insulation, painting & coating, asphalt paving, fencing and landscaping. The RFP packages are tentatively scheduled to be issued late November 2020 with proposals due December 30, 2020. 

BVCI is committed to equal opportunity and will not discriminate with regard to race, religion, color, ancestry, age, gender, disability, medical condition or place of birth and will not do business with any firm that discriminates on any basis. This Project is partially financed by the Clean Water State Revolving Fund (SRF) Program and therefore, all firms must adhere to SRF program requirements. Iron and steel products shall comply with the USEPA American Iron and Steel requirements and labor shall comply with Davis-Bacon Act. It is the policy of BVCI to encourage equal opportunity in its construction, consultant, material and supply contracts. Disadvantaged Business Enterprise (DBE) firms are encouraged to participate and non-DBE firms are encouraged to utilize DBE firms as sources of goods and services. Bidders must submit documentation of the affirmative steps taken to utilize DBEs in the work and documentation of its intended use of DBEs in the work prior to contract award.

This job is no longer available.

Black & Veatch Construction, Inc. (Bvci)

Santa Cruz, CA